Skip to content
Start with what the market knows

Price the company
before the mine.

Start with the market snapshot, then unlock the technical depth you need to compare resource quality, mine economics, risk and scenarios with confidence.

Read the methodologyView a worked example

OreScore calculator

Loading the interactive valuation workspace…

JavaScript is needed to enter figures and calculate results. The guides and explanations on this page remain readable without it.

What you put in

You type in the figures and OreScore does the arithmetic. Nothing is pre-filled and no live feed sits behind the inputs, so take each number from a source you have checked, usually the company's latest financial statements, reserve statement or technical report. Dated references and imports are labelled, and you review them before they apply. There are five stages, and you can stop after any of them.

Market snapshot. Enter the share price, basic shares (shares in issue today), fully diluted shares (basic shares plus those that options, warrants and similar securities could create), debt, cash and other liabilities. This gives market cap, what the market pays for the shares, and enterprise value (EV), what it pays for the mining business once debt and cash are accounted for.

Resource inventory. Add a line for each metal and category at each mine: tonnes, grade (metal per tonne), recovery (the share of metal the plant extracts), payability (the share the buyer pays for) and your company's ownership. Keep categories separate. Proven and probable (P&P) reserves have passed an economic study. Measured and indicated (M&I) resources are well drilled but not yet shown to be economic. Inferred resources are the least certain and are not reserves.

Build and operate. For each mine, enter annual production, unit cost (cash cost or all-in sustaining cost, AISC), mine life, years until production starts, initial capex, closure cost, royalty, tax and a discount rate. A higher discount rate makes future cash worth less today. These figures are best taken from a published study.

Risk lens. Score metallurgy, permitting, execution, funding, jurisdiction and social risk from 0 to 100, and enter an execution probability. These are your judgements, not measurements.

Scenarios and funding. Set bear, base and bull prices, production and capex. If the company must raise money, the optional funding and dilution section shows the effect on each share.

The free plan covers the market snapshot. Silver adds resource analysis and saved companies. Gold adds operations, risk, scenarios, comparisons and Excel exports. See how the valuation model works for a full worked example.

Methodology, assumptions & limitationsHow every number is calculated

What this is

A transparent screening tool built on your inputs. It is not a feasibility study, a forecast or investment advice, and no output is a recommendation to buy or sell. All money is in USD. Production is in koz for gold and silver and kt for copper; costs are per oz or per lb; totals are in USD millions.

Missing inputs and defaults

Each output has its own prerequisites. If one is missing, that output shows a dash and the reason; the others still calculate. An entered number is not a verified number. Optional inputs left blank (corporate G&A, growth capex, conversion capital, production schedule, other assets) are left out and do not change results, though blank G&A can overstate NAV, so a disclaimer appears. Defaults apply only inside features you switch on: M&I and inferred conversion weights (50% and 20%), the 15-year resource extension cap, and pipeline rates (USD 150, 60 and 20 per oz). You can edit them.

Market screen

Market cap = share price × basic shares. EV = market cap + debt + other liabilities − cash. Annual free cash flow (FCF) = revenue − royalties − operating costs − sustaining capex − tax, at steady-state output. Tax = tax rate × pre-tax cash flow, with no depreciation; to allow for it, enter an effective rate. With several mines, company FCF counts only complete producing assets with a start year of 0, at your ownership share, less corporate G&A. Model value / share = (FCF × your multiple − debt + cash − other liabilities) ÷ diluted shares. The multiple is your assumption; no single multiple suits every company. This is separate from NAV.

Costs: avoid double counting

AISC already includes sustaining capital, so sustaining capex is ignored for an asset on an AISC basis. Enter it only with cash cost.

Resource screen

Value = contained metal × price × recovery × payability × ownership × category weight (P&P 78%, M&I 58%, inferred 28%). These weights are fixed screening weights, not probabilities. Rows are summed without deduplication, so check whether M&I already includes P&P. This is a quick in-ground figure that ignores capital, costs and timing, and it is not NAV. Rows marked "Exclude from resource screen" are left out of this figure only.

Mine-by-mine DCF

Each mine has its own finite cash flows and discount rate, and there is no terminal value. Yearly cash flow = annual FCF × that year's factor. The factor comes from your production schedule, or otherwise rises in a straight line over the ramp-up years. Asset NPV = present value of cash flows − initial capex × (1 + contingency) − present value of closure and growth capex. Capex falls at the asset's year zero, and the whole NPV is then discounted back by its start year. Project IRR is shown only for a single asset with no start offset, schedule, growth capex, G&A or resource extension. Strip ratio is information only and does not change costs.

Resource tiers

The default values P&P through the mine plan. "+ M&I" and "+ Inferred" convert your chosen share of those ounces into extra years at the same annual output, capped at 15 years by default, with optional conversion capital per ounce. M&I reported as inclusive is netted against P&P for the same mine and metal; M&I with no stated basis is not converted. Extra years are not proven mine life.

Risk

Risk factor = execution probability × (1 − execution risk ÷ 200) × (1 − average of the other five risks ÷ 200). Positive NPV is multiplied by this factor. Negative NPV is left as it is, so a haircut can never improve it. These are illustrative haircuts, not calibrated probabilities.

From assets to NAV per share

Equity NAV = sum of risked NPVs at your ownership share + cash − debt − other liabilities + other assets − present value of corporate G&A. NAV / share = equity NAV ÷ fully diluted shares. G&A runs over the production-weighted asset life, at your corporate rate or else the production-weighted asset rate. Price / unadjusted NAV uses NPVs before the risk haircut; Price / NAV uses them after it. Gold-equivalent ounces (AuEq) convert other metals at your entered prices. EV / reserve oz uses attributable contained P&P ounces, before recovery.

Inventory-only assets

An asset without economics adds no DCF value, and its value is unknown, not zero. Pipeline value uses a study NPV or the per-ounce rates, after the risk haircut, and is shown separately from NAV / share.

Scenarios

Bear, base and bull apply your prices and production and capex multipliers to the same company. The range shows sensitivity to your assumptions, not the odds of an outcome. If a stock only works in the bull case, find out which assumption explains the gap. The saved-company page adds what the share price implies and sensitivities, computed the same way.

Funding and dilution

Optional, and it never changes ordinary NAV. Equity raised = (funding required + other needs) × equity share. New shares = equity raised ÷ raise price. Funded NAV / share = (equity NAV + applied convertible debt + equity raised × (1 − issue costs)) ÷ (diluted shares + new shares). The raise is assumed to happen today, and any non-equity funding is not modelled. For existing securities, options and warrants use the treasury method per row, RSUs, PSUs and DSUs count in full, and convertibles convert if in the money. Nothing applies until you choose "Use as fully diluted shares".

What the model leaves out

One steady-state cash flow scaled by year factors; no depreciation, working capital, inflation or debt schedule; flat prices within a scenario; no grade changes beyond your schedule. Results are only as sound as the inputs. A precise answer built on guesses is still a guess.

Try it with your own figures

The calculator starts with the market snapshot. Nothing is pre-filled for you, and results depend on what you enter.

Open the mining stock calculator

Frequently asked questions

Does OreScore provide live share prices or metal prices?
No. The calculator works from the figures you enter, and the bundled samples are illustrative. Check every input against a current source before relying on the output.
Is the output investment advice?
No. It is an educational screening tool. Read the disclaimer page for the full limits of the model.
Do I need a mine plan to use it?
No. You can screen using the market snapshot and resource inventory alone, and add the optional mine plan only when you have defensible assumptions.